string(10) "newsevents"

After almost a year of works on-site, we are happy to share the final result of the small-scale renovation at the Institute of Informatics & Telecommunications. The building work started in Spring 2021 with a splash of colour on the walls and door frames. In the months that followed, signage and additional branded visuals were put in place to guide visitors once inside the building.

Skip to content